Contents

Foreword by Jonathan Barzilai v

Preface to the collected edition vii

Open Design, a Collaborative Approach to Architecture

Preface 1

Introduction 5

1 The Purpose of Open Design 9

2 Managing the Open Design Process 19

3 Modelling in Open Design 27

4 Uncertainty reduction and risk assessment 45

5 How to deal with the overabundance of information 53

6 How to deal with quality requirements 57

7 How to deal with conflicting requirements in the mathematical model 65

8 Open Design Computer Tools 77

Appendix A Behavioural theory of Argyris and Schon, a summary 83 Appendix B Individual optimum versus collective optimum, consequences for

Open Design 89

Open Design and Construct Management

Preface 99

Introduction 103

I Theory 107

1 The purpose of design and construct management 109

2 Design and construct management of simple projects 113

3 Design and construct management of complex projects 117

4 Consequences of applying best practices for simple projects to complex projects and vice versa 121

II Cases 123

5 Validation through cases 125

6 Renovation of the former KLM head office in The Hague 127

7 Expansion of Schiphol Airport in the eighties 133

8 The VPRO office 137

9 Shell-Mitsubishi petrochemical plant in Singapore 151

10 Renovation 'De Resident', The Hague 185

11 Concluding remarks 191

Appendix A 'Granny's Puzzle' 197

Open Design, Cases and Exercises

Preface 203

Introduction 209

I Exercises 215

1 Linear Programming with Negotiable Constraints 217

2 Monte Carlo simulation for real estate and infrastructure investments 231

3 Project Network Planning and Risk Assessment 245

4 Regression analysis of construction projects from the past 263

5 Preference Measurement: The key to incorporating soft variables 281

6 Integrating LP Multi Criteria Optimisation and Preference Modelling 289

7 Non-linear optimisation 293

8 Geometric modelling 299

II Cases 309

9 Linear Programming with negotiable constraints 311

10 Monte Carlo simulation 321

11 Network planning & risk assessment 325

12 Regression analysis: residential real estate 329

13 Preference Measurement: The key to incorporating soft variables 337

14 Integrating LP Multi Criteria Optimisation and Preference Modelling 345

15 Multi Criteria Optimisation 351

16 Non-linear, local, optimisation 359

17 Geometric modelling 363

List of Figures 367

List of Tables 373

Bibliography 377

Index 383

About the Authors 389

Open Design, a Collaborative Approach to Architecture

Lex A. van Gunsteren Peter-Paul van Loon

Real Estate Essentials

Real Estate Essentials

Tap into the secrets of the top investors… Discover The Untold Real Estate Investing Secrets Used By The World’s Top Millionaires To Generate Massive Amounts Of Passive Incomes To Feed Their Families For Decades! Finally You Can Fully Equip Yourself With These “Must Have” Investing Tools For Creating Financial Freedom And Living A Life Of Luxury!

Get My Free Ebook


Post a comment