Replacing thAtigun

In |une of 1977, the TransAlaska Pipeline was put into service as the successful conclusion of one of the most difficult projects in history. As part of the maintenance of the 48-inch diameter pipeline, instrumented "pigs" are run along the pipeline every year to detect both internal and external corrosion. In the fall of 1988, data from the pig run indicated that excessive external corrosion had occurred in an 8.5 mile section of the pipeline located in the Atigun River flood plain, 135 miles north of the Artie Circle (see map).