Identifying activities

PM Milestone Project Management Templates

PM Milestone 7000 Business Templates

Get Instant Access

Essentially there are three approaches to identifying the activities or tasks that make up a project - we shall call them the activity-based approach, the product-based approach and the hybrid approach.

The activity-based approach The activity-based approach consists of creating a list of all the activities that the project is thought to involve. This might involve a brainstorming session involving the whole project team or it might stem from an analysis of similar past projects. When listing activities, particularly for a large project, it might be helpful to subdivide the project into the main life style stages and consider each of these separately.

Rather than doing this in an ad hoc manner, with the obvious risks of omitting or double-counting tasks, a much favoured way of generating a task list is to create a Work Breakdown Structure (WBS). This involves identifying the main (or high-level) tasks required to complete a project and then breaking each of these down into a set of lower-level tasks. Figure 6.2 shows a fragment of a WBS where the design task has been broken dow n into three tasks and one of these has been further decomposed into two tasks.

Activities arc added to a branch in the structure if they directly contribute to the task immediately above - if they do not contribute to the parent task, then they should not be added to that branch. The tasks at each level in any branch should

Activities must be defined so that they meet these criteria. Any activity that does not meet these criteria must be redefined.

WBSs are advocated by BS 6079. which is discussed in Appendix B.

Project

1

1

Analyse

Design

Build

1

1

Data design

Process design

PtrycaJ design

Relational

Logeai

data analysts

data design

Figure 6.2 A fragment of an activity-based Work Breakdown Structure.

A complete task catalogue will normally include task definitions along with task input and output products and other task-related information.

include everything that is required to complete the task at the higher level - if they are not a comprehensive definition of the parent task, then something is missing.

When preparing a WBS. consideration must be given to the final level of detail or depth of the structure. Too great a depth will result in a large number of small tasks that will be difficult to manage, whereas a too shallow structure will provide insufficient detail for project control. liach branch should, however, be broken down at least to a level where each leaf may be assigned to an individual or responsible section within the organization.

Advantages claimed for the WBS approach include the belief that it is much more likely to result in a task catalogue that is complete and is composed of non-overlapping activities. Note that it is only the leaves of the structure that comprise the list of activities comprising the project - higher-level nodes merely represent collections of activities.

The WBS also represents a structure that may be refined as the project proceeds. In the early part of a project we might use a relatively high-level or shallow WBS. which can be developed as information becomes available, typically during the project's analysis and specification phases.

Once the project's activities have been identified (whether or not by using a WBS) they need to be sequenced in the sense of deciding w hich activities need to be completed before others can start.

The product-based approach The product-based approach, used in PRINCI: 2 and Step Wise, has already been described in Chapter 2. It consists of producing a Product Breakdown Structure and a Product Mow Diagram. The PFD indicates, for each product, which other products are required as inputs. The PFD can therefore be easily transformed into an ordered list of activities by identifying the transformations that turn some products into others. Proponents of this approach claim that it is less likely that a product will be left out of a PBS than that an activity might be omitted from an unstructured activity list.

This approach is particularly appropriate if using a methodology such as SSADM. which clearly specifies, for each step or task, each of the products required and the activities required to produce it. The SSADM Reference Manual provides a set of generic PBSs for each stage in SSADM (such as that shown in Figure 6.3). which can he used as a basis for generating a project-specific PBS.

Sptoftcaoon

Sptcrtcteoo

AnrUul*

Ooup*J

Mjtrc.

F^-Cton

«•CM'od Syttfnlooc* Data Mod*

tntty

Kteor*t

£t*ct OjKjnn*

I I

I I

SCuCfcfM

ACCOM P*?rs

PrOC—j Owcrtftons

looc* Data s'ucfcl't

OwoSon«

WHlO^lNp OMcrçfton*

Figure 63 SSADM Product Breakdown Structure for Requirements Specification (adapted from Goodtand and Slater).

Most good texts on SSADM will explain the tailoring of the generic PBSs and Activity Networks. The illustrations here are taken from M. Goodland and C. Slater. SSADM Version 4: A Practical Approach, McGraw-Hill. 1995.

The SSADM Reference Manual also supplies generic activity networks and, using the project-specific PBS and derived PFD, these may be used as a basis for developing a project-specific activity network. Figure 6.4 illustrates an activity network for the activities required to create the products in Figure 6.3.

Notice how the development of a PFD leads directly to an activity netw ork that indicates the sequencing of activities - in Figure 6.4« activity 340 (Fnhancc required data model) requires products from activity 330 and activ ity 360 needs products from both activities 330 and 340.

The hybrid approach The WBS illustrated in Figure 6.2 is based entirely on a structuring of activities. Alternatively, and perhaps more commonly, a WBS may be based upon the project's products as illustrated in Figure 6.5, which is in turn based on a simple list of final deliverables and, for each deliverable, a set of activities required to produce that product. Figure 6.5 illustrates a flat WBS and it is likely that, in a project of any size, it would be beneficial to introduce additional levels - structuring both products and activities. The degree to which the structuring is product-based or activity-based might be influenced by the nature of the project and the particular development method adopted. As with a purely activity-based WBS. having identified the activ ities we are then left with the task of sequencing them.

The activity numbers in Figure 6.4 are the step numbers used by SSADM version 4.

BS 6079 states that WBSs may be product-based, cost-centre-based, task-based or function-based but states that product-based WBSs are preferred.

Not all of the products in this activity structuring will be final products. Some will be further refined in subsequent steps.

The current version of the SSADM reference manual provides generic PBSs and generic activity networks, but not generic PFDs. Stress is placed on the fact that these are generic structures and it is important that project-specific versions are created. A project-specif* PFD would be produced as part of this process.

Figure 6.4 A structuring of activities for the SSADM Requirements Specification stage {from Goodland an J Slater).

A framework dictating the number of levels and the nature of each level in the structure may be imposed on a WBS. For example, in their MITP methodology, IBM recommend that the following five levels should be used in a WBS:

• Level 2: Deliverables such as software, manuals and training courses.

Define Required System Processing

Develop

Specification

Prototypes

OaeaC«atop* lope* Data Flo* Mod* lope* Oou S*y*€nny x»* utrdeiOM

Rt^rf^rts CMMK&J* g<»Cf i3 Buvnni Syvltm Opboo

Oou Course Outlines

Enhanco Requ*od Data Model

Figure 6.4 A structuring of activities for the SSADM Requirements Specification stage {from Goodland an J Slater).

Develop

Specification

Prototypes

Mcnu& Command Structure fl.^^fc .j-t m a ^^ m ^ m rTWXypnj ' wI

Enhanco Requ*od Data Model

OaeaC«atop* lope* Data Flo* Mod* lope* Oou S*y*€nny x»* utrdeiOM

Rt^rf^rts CMMK&J* g<»Cf i3 Buvnni Syvltm Opboo

Define Required System Processing

Protect

Installed system

Software components

User manuals

Training course

-

Analyse requirements

-

Review requirements

-

Analyse requirements

-H

Analyse requirements

Outline design

Outline design

Design manual

Design course

Detailed design

Detailed design

Write text

Write material

Integrate system

Code software

Capture screens

Prmt handouts

Test system

Test software

Do page layout

Deliver course

Deliver system

Print manuals

Use< testing

Figure 6.5 A Work Breakdow n Structure based on deliverables.

• Level 3: Components which arc the key work items needed to produce deliverables, such as the modules and tests required to produce the system software.

• Level 4: Work-packages which are major work items, or collections of related tasks, required to produce a component.

• Level 5: Tasks which are tasks that will normally be the responsibility of a single person.

Was this article helpful?

0 0
Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Responses

  • SVEN
    What are the approaches used in identifying the activities?
    4 years ago
  • Elisabeth
    What is product based approach for identifying activities in SEPM?
    3 years ago
  • Verdiana
    What is hybrid approach for identifie ACTIVITY?
    3 years ago
  • Richard
    What are the approaches to activity identification?
    3 years ago
  • Karen
    What is activity based approach in identifying activities?
    3 years ago
  • ralph gersten
    What are the two approaches that are used to identify project activities?
    3 years ago
  • Toivo
    What are the approach used to identify activities in spm?
    2 years ago
  • mosco
    What are the different approach used in identifying activites?
    1 year ago
  • Prudenzio
    How to create projecvt's activities based on entregables?
    1 year ago
  • tara
    What are the different approaches for identifying activity?
    3 months ago

Post a comment