References

[Boehm, 1981] Boehm, Barry W., Software Engineering Economics (Prentice-Hall, Englewood Cliffs, New Jersey, 1981). Used with permission.

[Boehm, 1987] Boehm, Barry W., "Industrial Software Metrics Top 10 List," IEEE Software, Volume 4, Number 5 (September 1987), 84-85. Copyright © 1987 IEEE. Used with permission.

[Boehm, 1988] Boehm, Barry W., "A Spiral Model of Software Development and Enhancement," Computer, Volume 21, Number 5 (May 1988), 61-72.

[Boehm, 1996] Boehm, Barry W., "Anchoring the Software Process," IEEE Software, Volume 13, Number 4 (July 1996), 73-82. Copyright © 1996 IEEE. Used with permission.

[Boehm and Royce, Walker, 1988] Boehm, Barry W., and Walker E. Royce, "TRW IOC Ada COCOMO: Definition and Refinements," Proceedings of the 4th COCOMO Users Group, Pittsburgh, Pennsylvania (November 1988).

[Boehm et al., 1995] Boehm, Barry W., Bradford Clark, Ellis Horowitz, Chris West-land, Ray Madachy, and Richard Selby, "Cost Models for Future Software Engineering Processes: COCOMO 2," Annuals of Software Engineering, Volume 1 (1995), 57-94.

[Booch, 1996] Booch, Grady, Object Solutions: Managing the Object-Oriented Project (Addison-Wesley Publishing Company, Menlo Park, California, 1996).

[Brown, 1996] Brown, Norm, "Industrial-Strength Management Strategies," IEEE Software, Volume 13, Number 4 (July 1996), 94-103. Copyright © 1996 IEEE. Used with permission.

[Davis, 1994] Davis, Alan M., "Fifteen Principles of Software Engineering," IEEE Software, Volume 11, Number 6 (November 1994), 94-96, 101. Copyright © 1994 IEEE. Used with permission.

[Davis, 1995] Davis, Alan M., 201 Principles of Software Development (McGraw Hill, New York, 1995). Copyright © 1995 McGraw Hill. Used with permission.

[Defense Science Board, 1994] Report of the Defense Science Board Task Force on Acquiring Defense Software Commercially (The Undersecretary of Defense, Acquisition and Technology, Washington, D.C. June 1994).

[DeMarco, 1982] DeMarco, Tom, Controlling Software Projects: Management, Measurement & Estimation (Yourdon Press, Englewood Cliffs, New Jersey, 1982).

[DOD, 1988] DOD-STD-2167A, Defense System Software Development, Space and Naval Warfare Systems Command (December 1988). Canceled December 5, 1994.

[Horowitz, 1997] Horowitz, Ellis, et ai, "USC COCOMO II, 1997 Reference Manual," USC-CSE technical report (University of Southern California, Los Angeles, California, 1997).

[Humphrey, 1989] Humphrey, Watts S., Managing the Software Process (Addison-Wesley Publishing Company, Reading, Massachusetts, 1989).

[Humphrey, 1995] Humphrey, Watts S., A Discipline for Software Engineering (Addison-Wesley Publishing Company, Reading, Massachusetts, 1995).

[Jones, 1994] Jones, Capers, "The Economics of Object-Oriented Software," American Programmer, Volume 7, Number 10 (October 1994), 28-35.

[Jones, 1995] Jones, Capers, "Table of Programming Languages and Levels, Version 8," Software Productivity Research white paper (Burlington, Massachusetts), June 1995. Copyright © 1995 Capers Jones. Used with permission.

[Jones, 1996] Jones, Capers, Patterns of Software Systems Failure and Success (International Thomson Computer Press, Boston, Massachusetts, 1996).

[Kruchten, 1995] Kruchten, Phillipe B., "The 4+1 View Model of Architecture," IEEE Software, Volume 12, Number 6 (November 1995), 42-50. Copyright © 1995 IEEE. Used with permission.

[Royce, Walker, 1989] Royce, Walker E., "Ada Process Model Guidebook," Systems Engineering and Development Division Document TRW-TS-89-08 (TRW, Redondo Beach, California), November 1989. Used with permission.

[Royce, Walker, 1990] Royce, Walker E., "Pragmatic Quality Metrics for Evolutionary Software Development Models," Proceedings TRI-Ada '90, Baltimore, Maryland (December 1990), 551-565.

[Royce, Walker, 1990b] Royce, Walker E., "TRW's Ada Process Model for Incremental Development of Large Software Systems," Proceedings of the IEEE 12th International Conference on Software Engineering, Nice, France, March 26-30, 1990.

[Royce, Walker, 1997] Royce, Walker E., "Managing Successful Iterative Development Projects: A Seminar on Software Best Practices," Version 2.3 (Rational Software Corporation, Menlo Park, California), 1997.

[Royce, Winston, 1970] Royce, Winston W., "Managing the Development of Large Software Systems," Proceedings of IEEE WESCON (August 1970), 1-9.

[SEI, 1993] Capability Maturity Model for Software, Version 1.1, Document No. CMU/SEI-93-TR-24, ESC-TR-93-177 (Carnegie Mellon University Software Engineering Institute, Pittsburgh, Pennsylvania, 1993). Used with permission.

[SEI, 1993b] Key Practices of the Capability Maturity Model, Version 1.1, Document No. CMU/SEI-93-TR-25, ESC-TR-93-178 (Carnegie Mellon University Software Engineering Institute, Pittsburgh, Pennsylvania, 1993). Used with permission.

[SEI, 1995] Carnegie Mellon Software Engineering Institute, The Capability Maturity Model: Guidelines for Improving the Software Process (Addison-Wesley Publishing Company, Reading, Massachusetts, 1995).

[SEI, 1998] Maturity Questionnaire, Document No. CMU/SEI-94-SR-007 (Carnegie Mellon University Software Engineering Institute, Pittsburgh, Pennsylvania, June 1994). Used with permission.

[Standish Group, 1995] The Standish Group, "Chaos," 1995. Used with permission.

Was this article helpful?

0 0
Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment