Iteration Workflows

An iteration consists of a loosely sequential set of activities in various proportions, depending on where the iteration is located in the development cycle. Each iteration is defined in terms of a set of allocated usage scenarios. The components needed to implement all selected scenarios are developed and integrated with the results of previous iterations. An individual iteration's workflow, illustrated in Figure 8-2, generally includes the following sequence:

• Management: iteration planning to determine the content of the release and develop the detailed plan for the iteration; assignment of work packages, or tasks, to the development team

• Environment: evolving the software change order database to reflect all new baselines and changes to existing baselines for all product, test, and environment components

Grille Valuation Software

• Requirements: analyzing the baseline plan, the baseline architecture, and the baseline requirements set artifacts to fully elaborate the use cases to be demonstrated at the end of this iteration and their evaluation criteria; updating any requirements set artifacts to reflect changes necessitated by results of this iteration's engineering activities

• Design: evolving the baseline architecture and the baseline design set artifacts to elaborate fully the design model and test model components necessary to demonstrate against the evaluation criteria allocated to this iteration; updating design set artifacts to reflect changes necessitated by the results of this iteration's engineering activities

• Implementation: developing or acquiring any new components, and enhancing or modifying any existing components, to demonstrate the evaluation criteria allocated to this iteration; integrating and testing all new and modified components with existing baselines (previous versions)

• Assessment: evaluating the results of the iteration, including compliance with the allocated evaluation criteria and the quality of the current baselines; identifying any rework required and determining whether it should be performed before deployment of this release or allocated to the next release; assessing results to improve the basis of the subsequent iteration's plan

• Deployment: transitioning the release either to an external organization (such as a user, independent verification and validation contractor, or regulatory agency) or to internal closure by conducting a post-mortem so that lessons learned can be captured and reflected in the next iteration

As with any sequence of a software development workflow, many of the activities occur concurrently. For example, requirements analysis is not done all in one continuous lump; it intermingles with management, design, implementation, and so forth.

Iterations in the inception and elaboration phases focus on management, requirements, and design activities. Iterations in the construction phase focus on design, implementation, and assessment. Iterations in the transition phase focus on assessment and deployment. Figure 8-3 shows the emphasis on different activities across the life cycle.

These descriptions are pretty simplistic. In practice, the various sequences and overlaps among iterations become more complex. The terms iteration and increment deal with some of the pragmatic considerations. An iteration represents the state of the overall architecture and the complete deliverable system. An increment represents the current work in progress that will be combined with the preceding iteration to form the next iteration. Figure 8-4, an example of a simple development life cycle, illustrates the difference between iterations and increments. This example also illustrates a typical build sequence from the perspective of an abstract layered architecture.

Management

Requirements

Design

Implementation

Inception and Elaboration Phases

Assessment

Deployment

Management

Requirements

Design

Implementation

Construction Phase

Assessment

Deployment

Management

Requirements

Design

Implementation

Transition Phase

Assessment

Deployment

Figure 8-3. Iteration emphasis across the life cycle

Inception

Elaboration

Construction

Was this article helpful?

+2 -3
Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Responses

Post a comment