In order to understand project management, one must begin with the definition of a project. A project can be considered to be any series of activities and tasks that:

• Have a specific objective to be completed within certain specifications

• Have defined start and end dates

• Have funding limits (if applicable)

• Consume human and nonhuman resources (i.e., money, people, equipment)

• Be multifunctional (i.e., cut across several functional lines)

Project management, on the other hand, involves project planning and project monitoring and includes such items as:

• Project planning

• Definition of work requirements

• Definition of quantity and quality of work

• Definition of resources needed

• Project monitoring

• Tracking progress

• Comparing actual outcome to predicted outcome

• Analyzing impact

• Making adjustments

Successful project management can then be defined as having achieved the project objectives:

• At the desired performance/technology level

• While utilizing the assigned resources effectively and efficiently

• Accepted by the customer

The potential benefits from project management are:

• Identification of functional responsibilities to ensure that all activities are accounted for, regardless of personnel turnover

• Minimizing the need for continuous reporting

• Identification of time limits for scheduling

• Identification of a methodology for trade-off analysis

• Measurement of accomplishment against plans

• Early identification of problems so that corrective action may follow

• Improved estimating capability for future planning

• Knowing when objectives cannot be met or will be exceeded

Unfortunately, the benefits cannot be achieved without overcoming obstacles such as:

• Project complexity

• Customer's special requirements and scope changes

• Organizational restructuring

• Project risks

• Changes in technology

• Forward planning and pricing

Project management can mean different things to different people. Quite often, people misunderstand the concept because they have ongoing projects within their company and feel that they are using project management to control these activities. In such a case, the following might be considered an appropriate definition:

Project management is the art of creating the illusion that any outcome is the result of a series of predetermined, deliberate acts when, in fact, it was dumb luck.

Although this might be the way that some companies are running their projects, this is not project management. Project management is designed to make better use of existing resources by getting work to flow horizontally as well as vertically within the company. This approach does not really destroy the vertical, bureaucratic flow of work but simply requires that line organizations talk to one another horizontally so work will be accomplished more smoothly throughout the organization. The vertical flow of work is still the responsibility of the line managers. The horizontal flow of work is the responsibility of the project managers, and their primary effort is to communicate and coordinate activities horizontally between the line organizations.

Figure 1-1 shows how many companies are structured. There are always "class or prestige" gaps between various levels of management. There are also

Figure 1-1. Why are systems necessary?

functional gaps between working units of the organization. If we superimpose the management gaps < top of the functional gaps, we find that companies are made up of small operational islands that refuse to communicate with one another for fear that giving up information may strengthen their opponents. The project manager's responsibility is to get these islands to communicate cross-functionally toward common goals and objectives.

The following would be an overview definition of project management:

Project management is the planning, organizing, directing, and controlling of company resources for a relatively short-term objective that has been established to complete specific goals and objectives. Furthermore, project management utilizes the systems approach to management by having functional personnel (the vertical hierarchy) assigned to a specific project (the horizontal hierarchy).

The above definition requires further comment. Classical management is usually considered to have f functions or principles:

• Organizing

• Controlling

You will notice that, in the above definition, the staffing function has been omitted. This was intentio because the project manager does not staff the project. Staffing is a line responsibility. The project manager has the right to request specific resources, but the final decision of what resources will be committed rests with the line managers.

We should also comment on what is meant by a "relatively" short-term project. Not all industries hav the same definition for a short-term project. In engineering, the project might be for six months or tw< years; in construction, three to five years; in nuclear components, ten years; and in insurance, two weeks.

Figure 1-2. Overview of project management.

Long-term projects, which consume resources full-time, are usually set up as a separate division (if large enough) or simply as a line organization.

Figure 1-2 is a pictorial representation of project management. The objective of the figure is to show that project management is designed to manage or control company resources on a given activity, within time, within cost, and within performance. Time, cost, and performance are the constraints on the project. If the project is to be accomplished for an outside customer, then the project has a fourth constraint: good customer relations. The reader should immediately realize that it is possible to manage a project internally within time, cost, and performance and then alienate the customer to such a degree that no further business will be forthcoming. Executives often select project managers based on who the customer is and what kind of customer relations will be necessary.

Was this article helpful?

0 0
Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment