System design risk review SDRR

This review is conducted to assess allocated requirements and assess their optimization, completeness, and inherent risks. This will include a review of basic manufacturing considerations and detailed design stage engineering plans. This review should be conducted when system definition has progressed to the point where subassembly configuration items are identified. System design reviews may be utilized to document assumptions made in the flow-down of requirements to subassembly levels.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment