Step Production transition

The risk in transition from development to manufacturing is that the product is not defined and/or cannot be assembled and manufactured. The purpose of production transition is to facilitate a smooth transition from the development of the product to production scheduling. The production transition stage ensures that:

■ All documentation required to produce the product in a production environment is released and is up to date

■ All test equipment, cables, test software, and fixtures are available and documentation is released

■ Knowledge of any special manufacturing, test, or inspection criteria is defined

■ Training on all aspects of the production product and test equipment is complete, and production personnel have a working knowledge of the equipment and test methods used to test/troubleshoot the equipment

The production transition stage concludes with a successful Production Readiness Review.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment