Step Detailed design

There are inherent risks in handoffs from one stage to another, thus the importance of design reviews before entering the next stage. The purpose of detailed design is to convert the product requirements into graphic design and/or hard copy drawings used to produce the product. Detailed design for each subsystem is started when the requirements for the subsystem are understood. The risk here is that the design will commence before requirements are understood, or that requirements fundamentally change during design.

Detailed design also produces acceptance test requirements, analysis documents, support requirements and interface control documents. Detailed design works to enable product manufacturing, and validates performance against design input requirements. Design reviews ensure that all requirements are addressed, and that all the documentation is available for project review at the end of the process.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment