Step Design validation

The risk here is that the product will not work to meet user needs, even though the design has been verified. The purpose of design validation is to ensure that the product in operation meets all of the requirements imposed by the applicable specifications. Hardware and software validation of a production product are governed by the appropriate industry standards. The specific requirements for a given product are contained within the systems requirement documents. For test equipment, validation is performed to an internally generated document to ensure that the equipment meets the standards required for thoroughly testing the production product.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment