Network diagram. Having identified the basic tasks of this summary task, you now build a network diagram of this summary task, which is later integrated with other summary tasks diagrams to create the whole project network, as follows.

Start with a network template. Always start your network diagramming with a template or model of the "typical" network, and adjust it to the project you are planning. A typical template looks like this, with three paths and parallel activities, ending in one task (See Figure 3-5).

Then tailor your model to your project as shown in Figure 3-6.

Time-based network diagram. Here you simply place the network diagram on a time-based graph. Draw the length of the arrows representing each task to equate with their actual durations as aligned with the bottom calendar of 97 days. Note that Figure 3-7 shows "float," or "slack," the dotted lines that represent the flexibility in what "time slot" you determine to do the non-critical

Figure 3-5 Network diagram template.
Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment