Configuration Management System

The configuration management system is a subsystem of the overall project management information system; however, its main purpose is control of the design of the product for later production and support. It captures the official definition of the product as it moves through changes to its final production configuration. The system includes the process for submitting proposed changes, tracking systems for reviewing and approving proposed changes, defining approval levels for authorizing changes, and providing a method to validate approved changes. In most application areas, the configuration management system includes the change control system. The configuration management system is also a collection of formal documented procedures used to apply technical and administrative direction and surveillance to:

■ Identify and document the functional and physical characteristics of a product or component

■ Control any changes to such characteristics

■ Record and report each change and its implementation status

■ Support the audit of the products and components to verify conformance to requirements

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment