Table Project Management Compared To Project Engineering

Project Management Total project planning Cost control Schedule control System specifications Logistics support

Project Engineering

• Total project planning

• Schedule control

• System specifications

• Logistics support

Contract control

Report preparation and distribution Procurement

Identification of reliability and maintainability requirements Staffing

Priority scheduling Management information systems

Configuration control

Fabrication, testing, and production technical leadership support engineer have similar functions above the line but different ones below the line.20 The main reason for separating project management from project engineering is so that the project engineer will remain "solid" to the director of engineering in order to have the full authority to give technical direction to engineering.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook

Post a comment