Risk

The successful completion of Level 2 usually occurs with a medium degree of difficulty. The time period to complete Level 2 is usually six months to two years, based upon such factors as:

• Type of company (project-driven versus non-project-driven)

• Visibility of executive support

• Strength of the corporate culture

• Resistance to change

• Speed with which a good, workable methodology can be developed

• Existence of an executive-level champion to drive the development of the project management methodology

• Speed with which the project management benefits can be realized

The risk in this level can be overcome through strong, visible executive support.

0 0

Post a comment