Advancement Criteria

There are four key actions required to complete Level 2 and advance to Level 3.

These actions are as follows:

• Develop a culture that supports both the behavioral and quantitative sides of project management.

• Recognize both the driving forces/need for project management and the benefits that can be achieved in both the short term and the long term.

• Develop a project management process/methodology such that the desired benefits can be achieved on a repetitive basis.

• Develop an ongoing, all-employee project management curriculum such that the project management benefits can be sustained and improved upon for the long term.