Quality reviews

As manufacturing or distribution processes change, a periodic review must be carried out to ensure that the quality procedures are still relevant and applicable in the light of the changed conditions. Statutory standards may also have been updated and these reviews check that the latest versions have been incorporated.

As part of the reviewing process, existing, proposed or new suppliers and contractors have to confirm their compliance with quality assurance procedures. Figure 17.3 shows the type of letter which should be sent periodically to all vendors.

All the above procedures are sometimes described as the 'tools' of quality management to which can be added the following techniques:

• Failure mode analysis (Cause and effect analysis)

• Pareto analysis

CODE : DS' 1113 : BOILERS Approved by./^/J^

LEGEND D = Domestic

Inspection C = Certificate

Required T = Internal

Record R = Random Insp. (i.e. R10 = 10%) E = External

Surveillance = Mandatory Inspection

SURVEY AUTHORITY

Description of Part

REFERENCE DOCUMENT

BR. 6 0 0/10 8M BS. 111s

BS. 111s

ft ft S

ft ft S

ft ft S

BS. 111s

BS. 111s

BS. 111s

ft ft S

OPERATION

Material Identification

Inspection of Set Up

Inspection of Marking Off/ Drilling and Machining

Tube Manipulation

VisualInspection of Welding

Radiographic Examination

Magnetic Particle Examination

Hydraulic Test

Release for Despatch

SUPERHEATER AND PANELS \

1

2

s

4

S

6

7

8

9

Headers and End Caps

D

C

I

I

E

B

Header Circ. Welds

D

I

C

E

B

Stubs/Panel Tubes

D

C

I10

E

Stubs to Header/ Panel to Hdr.Welds

D

I10

I

C10

E

B

Tubes

D

C

I10

I10

E

Tube Butt Welds

D

I

C10

E

B

Attachments

D

C

IS

E

Attachment Welds

D

I

E

Complete Superheater

D

C

C

E

B

Completed Panels

D

C

C

E

B

Figure 17.2 Quality assurance approval

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.