Quality Control

Quality control is the inspection of finished products to ensure that they meet required standards or are fit for their purpose. Where products fail, remedial action is taken. Thus, quality control is normally considered something that goes on after the work has been done. It makes no sense at all to keep on doing things wrong in the hope that mistakes will be picked up and rectified in quality control.

Figure 7.8: Quality assurance and control
0 0

Post a comment