Design authority

A role within the project that has the responsibility to manage the design of the business and information systems that are affected or created by the project. This means ensuring that designs are consistent across all projects in the portfolio and consistent with supporting services and infrastructure designs and plans, and that designs comply with the policies and standards of the organization and the project. The design authority is also responsible for change control to technical specifications and technical infrastructure.

0 0

Post a comment