Verify Scope

Verify Scope is the process of formalizing acceptance of the completed project deliverables. Verifying the project scope includes reviewing deliverables to ensure that each is completed satisfactorily. If the project is terminated early, the project scope verification process should establish and document the level and extent of completion. Scope verification differs from quality control in that scopc verification is primarily concerned with acceptance of the deliverables, while quality control is primarily concerned with correctness of the deliverables and meeting the quality requirements specified for the deliverables. Quality control is generally performed before scope verification, but these two processes can be performed in parallel. Table 5-5 provides the associated inputs, tools, techniques, and outputs and the proccss flow diagram. Figure 5-11, provides an overall summary of the basic How and interactions within this process.

Table 5-5. Verify Scope: Inputs, Tools & Techniques, and Outputs

Table 5-5. Verify Scope: Inputs, Tools & Techniques, and Outputs

Project Scope Management

5.1 Collect Requirements

5.3 Create WBS

S.3

Perform

Quality Control

; • Organizational Process

* Stakeholder requirements documentation » Requirements traceabilrty matrix

Assets

* Stakeholder requirements documentation » Requirements traceabilrty matrix

Assets t T

5.4 Verify Scope

4.5 Perform Integrated Change Control

■ Change requests

• Accepled deliverables

4.6 Close Project or Phase

Figure 5-7 Verify Scope Data Flow Diagram

Was this article helpful?

0 0
Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment