Understanding Source Code Control Integration

When you integrate FogBugz with a source code control system, you're setting up a two-way link between the two systems. This means two things:

• When you're looking at a case, you can see the code that was checked in to resolve the case.

• When you're looking at a code check-in, you can see the case that it was intended to fix.

These two-way links make it much easier to keep track of what's going on as your software makes its way from conception to release. Before showing you the actual mechanics of setting this stuff up, I'll go through a scenario in which the links come in very handy, and then discuss the different choices for source code control software to use with FogBugz.