References

7.1 Eisner, H. (1988). Computer-Aided Systems Engineering. Englewood Cliffs, NJ: Prentice Hall.

7.2 Goode, H. H., and R. E. Machol (1957). System Engineering. New York: McGraw-Hill.

7.3 Engineering Management, Military Standard 499A (1974). Washington, DC: U.S. Department of Defense.

7.4 Systems Engineering Management Guide (1983, 1990). Fort Belvior, VA: Defense Systems Management College.

7.5 Beam, W. R. (1990). Systems Engineering—Architecture and Design. New York: McGraw-Hill.

7.6 Sage, A. P. (1992). Systems Engineering. New York: John Wiley.

7.7 Blanchard, B. S., and W. J. Fabrycky (1990). Systems Engineering and Analysis. Englewood Cliffs, NJ: Prentice Hall.

7.8 Chapman, W. L., A. T. Bahill, and A. W. Wymore (1992). Engineering Modeling and Design. Boca Raton, FL: CRC Press.

7.9 Wymore, A. W. (1993). Model-Based Systems Engineering. Boca Raton, FL: CRC Press.

7.10 Sage, A. P., and W. B. Rouse, eds. (1999). Handbook of Systems Engineering and Management. New York: John Wiley.

7.11 Sage, A. P., and J. E. Armstrong, Jr. (2000). Introduction to Systems Engineering. New York: John Wiley.

7.12 The NASA Mission Design Process (1992). Washington, DC: National Aeronautics and Space Administration, Engineering Management Council.

7.13 Boehm, B. W. (1981). Software Engineering Economics. Englewood Cliffs, NJ: Prentice Hall; see also Boehm, B. W. (2000). Software Cost Estimation with COCOMOII. Upper Saddle River, NJ: Prentice Hall PTR.

7.14 Department of Defense (DoD) Website: web2.deskbook.osd.mil

7.15 Life Cycle Risk Management Elements for NASA Programs (1997). Washington DC: National Aeronautics and Space Administration Headquarters, June.

7.16 Carter, D. E., and B. S. Baker (1992). Concurrent Engineering—The Product Development Environment for the 1990s. Reading, MA: Addison-Wesley.

7.17 Specification Practices, Military Standard 490 (1972). Washington, DC: U.S. Department of Defense.

7.18 Comer, E. R. (1972). Catalyst: Automating Systems Engineering in the 21st Century Paper from the Proceedings of the 2nd Annual International Symposium of the National Council on Systems Engineering (NCOSE), Seattle, July 20-22.

7.19 Charette, R. N. (1986). Software Engineering Environments—Concepts and Technology. New York: McGraw-Hill.

7.20 Eisner, H., J. Marciniak, R. McMillan, and W. Pragluski (1993). RCASSE: Rapid Computer-Aided System of Systems (S2) Engineering. Paper from the Proceedings of the 3rd Annual International Symposium of the National Council on Systems Engineering (NCOSE), Arlington, VA, July 26-28.

7.21 Blanchard, B. S. (1986). Logistics Engineering and Management. Englewood Cliffs, NJ: Prentice Hall.

7.22 Defense Acquisition Management Policies and Procedures, DoD Instruction 5000.2. Washington, DC: U.S. Department of Defense.

7.23 Standard for Systems Engineering, IEEE P1220 (1994). Piscataway, NJ: IEEE Standards Department.

7.24 Shishko, R. (1995). NASA Systems Engineering Handbook, SP-6105. Washington, DC: National Aeronautics and Space Administration (NASA) Headquarters, June.

7.25 Marciniak, J., editor-in-chief (1994). Encyclopedia of Software Engineering. New York: John Wiley.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment