References

13.1 Mondy, R. W., and S. R. Premeaux (1993). Management: Concepts, Practices, and Skills. Boston: Allyn and Bacon.

13.2 Bowen, D. (1995). ''Work Group Research: Past Strategies and Future Opportunities,'' IEEE Transactions on Engineering Management 42(1).

13.3 Systems Engineering, Military Standard 499B (1991). Washington, DC: U.S. Department of Defense.

13.4 Software Development and Documentation, Military Standard 498 (1994). Washington, DC: U.S. Department of Defense.

13.5 The Role of Concurrent Engineering in Weapons System Acquisition, Report R-338. Alexandria, VA: Institute for Defense Analyses.

13.6 Pennell, J., and M. Slusarczuk (1989). An Annotated Reading List for Concurrent Engineering, Document D-571. Alexandria, VA: Institute for Defense Analyses.

13.7 Serpa, R. (1991). ''Teamwork Starts at the Top,'' Chief Executive 66: 30-33.

13.8 Senge, P. (1990). The Fifth Discipline. New York: Doubleday.

13.9 Schein, E., ''On Dialogue, Culture and Organizational Learning,'' Engineering Management Review 23(1): 23-29.

13.10 Peck, M. Scott. (1993). A World Waiting to Be Born. New York: Bantam Books.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment