References

9.1 Rechtin, E. (1991). Systems Architecting. Englewood Cliffs, NJ: Prentice Hall.

9.2 The NASA Mission Design Process (1992). Washington, DC: National Aeronautics and Space Administration, NASA Engineering Management Council.

9.3 Phase C/D Requirements Specification for the Earth Observing System Data and Information System (EOSDIS) (1990). Greenbelt, MD: Goddard Space Flight Center.

9.4 Earth Observing System (EOS) Data and Operations System (EDOS) Statement of Work (1992). Greenbelt, MD: Goddard Space Flight Center.

9.5 Payload Data .Services System (PDSS) Operations Concept Document and Development Specification (1992). National Aeronautics and Space Administration, Marshall Space Flight Center.

9.6 C4ISR Architecture Framework, version 2.0 (1997). Washington, DC: Architectures Working Group, U.S. Department of Defense (DoD), December 18.

9.7 Standard for Systems Engineering, IEEE P1220 (1994). Piscataway, NJ: Institute of Electrical and Electronics Engineers (IEEE) Standards Department.

9.8 Draft Recommended Practice for Architectural Description, IEEE P1471/D5.2, (1999). New York: Institute of Electrical and Electronics Engineers (IEEE), December.

9.9 Eisner, H. (1988). Computer-Aided Systems Engineering. Englewood Cliffs, NJ: Prentice-Hall.

9.10 The architecting of this particular system was carried out by Richard C. Anderson, a student at The George Washington University, using the procedure defined by this author. The original description of and architecture for this system is provided in Section A.5 of the Appendix.

9.11 Henley, E., and H. Kumamoto (1981). Reliability Engineering and Risk Assessment. Englewood Cliffs, NJ: Prentice Hall.

9.12 Charette, R. (1989). Software Engineering Risk Analysis and Management. New York: Multiscience Press.

9.13 Systems Engineering, Military Standard 499B (Draft) (1991). Washington, DC: U.S. Department of Defense.

9.14 Swain, J. (1991). ''World of Choices: Simulation Software Survey,'' OR/MS Today (October): 81-102.

9.15 Swain, J. (1993). ''Flexible Tools for Modeling,'' OR/MS Today (December): 62-78.

9.16 Swain, J. (2001). ''Power Tools for Visualization and Decision-Making,'' OR/ MS Today (February): 52-63.

9.17 Pritsker, A. (1990). Papers, Experiences, Perspectives. West Lafayette, IN: Systems Publishing.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment