References

10.1 Fromson, B. (1994). ''Fidelity Says It Reported Wrong Prices,'' Washington Post, June ZS.

10.Z Fox, J. (198Z). Software and Its Development. Englewood Cliffs, NJ: Prentice Hall.

10.S Marciniak, J., and J. Reifer (1990). Software Acquisition Management. New York: John Wiley.

10.4 Arthur, L. J. (199Z). Rapid Evolutionary Development. New York: John Wiley.

10.5 Military Standard—Software Development and Documentation, Military Standard 498 (1994). Washington, DC: U.S. Department of Defense.

10.G Military Standard—Defense System Software Development, DOD-STD-Z1GTA (1988). Washington, DC: U.S. Department of Defense.

10.T Military Standard—Software Quality Evaluation, DOD-STD-Z1G8 (19T9). Washington, DC: U.S. Department of Defense.

10.8 ISO 9000, Contact American National Standards Institute (ANSI). New York: International Organization for Standardization.

10.9 IEEE Standards Products Catalog (199S). Piscataway, NJ: Institute of Electrical and Electronics Engineers.

10.10 Standard for Information Technology - Software Life Cycle Processes, IEEE/ EIA ^OT.O-^G (ISO/IEC ^OT) (1998). New York: Institute of Electrical and Electronics Engineers, March.

10.11 Boehm, B., ed. (1989). Software Risk Management, New York: IEEE Computer Society Press.

10.12 Humphrey, W. (1987). Characterizing the Software Process: A Maturity Framework, CMU/SEI-87-TR-11, DTIC Number ADA 182895. Pittsburgh: Software Engineering Institute.

10.13 Paulk, M. B. Curtis, and M. B. Chrissis (1991). Capability Maturity Model for Software, CMU/SEI-91-TR-24. Pittsburgh: Software Engineering Institute.

10.14 Saiedian, H., and R. Kuzara (1995). ''SEI Capability Maturity Model's Impact on Contractors,'' IEEE Computer Magazine (January): 16-25.

10.15 Boehm, B. (1981). Software Engineering Economics. Englewood Cliffs, NJ: Prentice Hall.

10.16 Boehm, B., et al. (2000), Software Cost Estimation with COCOMO II. Upper Saddle River, NJ: Prentice Hall PTR.

10.17 Kile, Raymond L. (1992). REVIC, Version 9.1.1. Contact STSC, Hill AFB, Ogden, Utah.

10.18 Software Technology Support Center (STSC), Hill AFB, Ogden, UT: See also CrossTalk: The Journal of Defense Software Engineering, Ogden ALC/TISE, 7278 Fourth Street, Hill AFB, UT 84056-5205.

10.19 Jones, C. (1994). ''Software Metrics: Good, Bad and Missing,'' IEEE Computer Magazine (September): 98-100.

10.20 Matson, J., B. Barrett, and J. Mellichamp (1994). ''Software Development Cost Estimation Using Function Points,'' IEEE Transactions on Software Engineering 20(4): 275-286.

10.21 Marciniak, J., ed. (1994). Encyclopedia of Software Engineering. New York: John Wiley.

10.22 Musa, J., A. Iannino, and K. Okumoto (1987). Software Reliability. New York: McGraw-Hill.

10.23 Farr, W., and O. Smith (1991). Statistical Modeling and Estimation of Reliability Functions for Software (SMERFS) Users Guide, NAVSWC TR 84-373, Revision 2. Dahlgren, VA: Naval Surface Warfare Center.

10.24 Lyu, M., F. Buckley, R. Tausworthe, T. Keller, and J. Musa (1995). ''Software Reliability: To Use or Not To Use?,'' CrossTalk 8(2): 20-26. Published by the Software Technology Support Center, Hill AFB, Ogden, UT.

10.25 McCabe, T. (1976). ''A Complexity Measure,'' IEEE Transactions on Software Engineering 2(4): 308-320.

10.26 McCabe & Associates Website: www.mccabe.com

10.27 Augustine, N. (1982). Augustine's Laws. New York: American Institute of Aeronautics and Astronautics.

10.28 Rechtin, E. (1991). Systems Architecting. Englewood Cliffs, NJ: Prentice Hall.

10.29 Wirth, N. (1995). ''A Plea for Lean Software,'' IEEE Computer Magazine (February): 64-68.

10.30 Brooks, F. P., (1995). The Mythical Man-Month. Reading, MA: Addison Wesley Longman.

Project Management Made Easy

Project Management Made Easy

What you need to know about… Project Management Made Easy! Project management consists of more than just a large building project and can encompass small projects as well. No matter what the size of your project, you need to have some sort of project management. How you manage your project has everything to do with its outcome.

Get My Free Ebook


Post a comment